Back to category

track widening
-
Free 30 days exchanges
-
Quality car parts
-
EU Delivery: 2-3 days
-
Ask our experts for advice
Fit guarantee, show parts suitable for your vehicle.
Please your vehicle
-
Specifications
A packaging unit contains two Pro-Spacers. The Pro-Spacer
systems 4,5,6,7 and 8 will be complete,
supplied with the necessary mounting materials.
Guarantee 2 years Center ring Without centering ring Bolt Hole Circle Ø [mm] 120 Colour Silver Surface Anodised Number of Holes 5 Centering Diameter [mm] 67 Thread Size M14x1,5 Observe mounting information Track widening per axle [mm] 30 Thickness [mm] 15 -
Applicability
CHEVROLET CAMARO CAMARO | 09.2009-12.2015 3.6 - 3564ccm, 328pk, 241kw - LFX CAMARO | 09.2009-12.2015 3.6 - 3564ccm, 305pk, 224kw - LLT CAMARO | 09.2009-12.2015 3.6 - 3564ccm, 309pk, 227kw - LLT CAMARO | 09.2009-12.2015 3.6 - 3564ccm, 316pk, 232kw - LLT CAMARO | 09.2009-12.2015 6.2 - 6162ccm, 405pk, 298kw - L99(376CUV8) CAMARO | 09.2009-12.2015 6.2 - 6162ccm, 432pk, 318kw - LS3(376CUV8) CAMARO | 09.2009-12.2015 6.2 ZL1 - 6162ccm, 588pk, 432kw - LSA CAMARO | 09.2015-??? 2.0 Turbo - 1998ccm, 238pk, 175kw - LTG CAMARO | 09.2015-??? 2.0 Turbo - 1998ccm, 275pk, 202kw - LTG CAMARO | 09.2015-??? 6.2 - 6162ccm, 453pk, 333kw - LT1(376CUV8) CAMARO | 09.2015-??? 6.2 - 6162ccm, 461pk, 339kw - LT1(376CUV8) CAMARO Convertible CAMARO Convertible | 01.2011-??? 3.6 - 3564ccm, 316pk, 232kw - LLT CAMARO Convertible | 01.2011-??? 6.2 - 6162ccm, 405pk, 298kw - L99(376CUV8) CAMARO Convertible | 01.2011-??? 6.2 - 6162ccm, 432pk, 318kw - LS3(376CUV8) CAMARO Convertible | 01.2016-??? 2.0 Turbo - 1998ccm, 275pk, 202kw - LTG CAMARO Convertible | 01.2016-??? 6.2 - 6162ccm, 453pk, 333kw - LT1(376CUV8) CAMARO Convertible | 01.2016-??? 6.2 - 6162ccm, 461pk, 339kw - LT1(376CUV8) -
Manufacturer
Eibach production technologies are considered world leaders in their field. The products have been developed to meet even the most extreme demands in motorsport. -
Delivery time
Expected delivery date:
27-03-2025
-
Questions?
